Northern Ireland company Kingspan Renewables is continuing to expand its presence in the South African market.
As a result of a successful partnership with South African based eco supplier Green Power, Kingspan Renewables' Thermomax solar collectors are being used in an increasing number of commercial and residential projects across the country.
The Carpe Diem (Seize The Day) school for children with learning disabilities is the most recent commercial project to be completed by Green Power using Kingspan Renewables' products.
Green Power was commissioned by Carpe Diem, in March of this year, to develop a solar hot water system to heat the school's 20 year old swimming pool.
The company selected the award-winning Kingspan Renewables' Thermomax HP200 product as the perfect solar solution to address the school's needs.
Carpe Diem was impressed by the temperature limitation feature that prevents the collector from overheating; a necessary feature for the South African climate.
They were also pleased to receive a 20-year warranty on the vacuum tubes, offered by Green Power as part of the Kingspan Accredited Installer scheme. This guarantee is a first of its kind in solar technology within the South African market.
With electricity prices increasing year on year, Carpe Diem was focused on cutting utility costs. As a result the school's management decided to convert the 250 000L pool to a solar hybrid heating option.
Green Power conducted a comprehensive analysis of the school’s needs and identified the best solution for the school.
They needed to ensure that the pool was heated at a constant 28 degrees celsius daily, and address the problem of limited available roof space.
As a result, Green Power recommended a hybrid solution of both solar panels and heat pumps. The system was designed in such a way that the primary source of heating would be generated by the Thermomax solar panels with the heat pumps topping up, if and when required.
Green Power installed eight HP200 30 tube Kingspan Renewables collectors in parallel configuration in two sets of four collectors to overcome the issue of limited roof space. They also installed a 70kw pool heat exchanger and two backup 60kw Sirac heat pumps. In addition, Green Power recommended that the school use pool blankets for times when the pool is not in use as a means of retaining heat.
Additionally, the pool has also been made an indoor pool thanks to the installation of a blow up dome. The new system successfully meets the 28 degrees celsius daily heating requirement and has led to a reduced reliance on fossil fuels i.e. the burning of paraffin.
(CD)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
15/11/2024
An emergency road closure has been announced following serious structural integrity concerns of the former Antrim Arms Hotel building on Castle Street in Ballycastle. Following genuine fears surrounding the safety of the building's structure, Causeway Coast and Glens Borough Council have ...
15/11/2024
A pre-design public consultation for the Dublin-based College Green - Dame Street Public Realm Project has been launched. The proposal to remodel College Green and Dame Street is a joint initiative by Dublin City Council and the National Transport Authority. The project aims to transform Dublin's ...
15/11/2024
A new plan which aims to fill vacant homes and revitalise derelict buildings has been proposed by Ireland's Green Party. The Dereliction and Building Regeneration Bill put forward by the party aims to establish a single permitting system for fire, accessibility and planning in a one-stop-shop for ...
15/11/2024
Works will begin next week to provide a more reliable water supply in County Kildare, Uisce Éireann has announced. The improvements, which will take place in Allenwood, will also target the reduction of high levels of leakage. GMC Utilities Group are carrying out the works on behalf of Uisce ...
15/11/2024
Essential wastewater improvements being made to the North Street area in Carrickfergus are set to be completed on Friday, November 22, NI Water has announced. Further works will recommence to the area on January 6, after the busy Christmas period. The work is part of a major investment to improve ...
15/11/2024
A forthcoming road closure in Wicklow has been announced by the County Council ahead of essential roadworks which are suspected to last a week. The closure will impact the L-69052 road in Arklow and will take place on the junction of the L2901, Laffin's Lane and The Brook, from Monday, November ...
14/11/2024
A L'Derry park was visited by the Minister of Agriculture, Environment and Rural Affairs yesterday following the completion of extensive works. Manor Park in Moneymore welcomed Minister Andrew Muir MLA, who made the trip to see the result of extensive works which totalled £260,000. The ...
14/11/2024
A Railway Order planning application will be made by Transport Infrastructure Ireland (TII) regarding the major Luas Finglas project. The application will be submitted to An Bord Pleanála on Monday, November 18, while the public can make submissions about the proposed light rail line from November ...
14/11/2024
A new €8.8 million social housing scheme officially launched in County Louth recently. The Ferrard Park development in Drogheda contains 28 new houses which were acquired by Louth County Council from CFS Homes for tenants from the council's social housing waiting list. The houses, which include a ...
14/11/2024
A number of projects across Wicklow aimed at addressing the negative impacts of climate change have received a significant cash boost. Wicklow County Council and The Department of the Environment, Climate and Communications announced an allocation of €675,574.33 to 20 community groups across the ...