Construction Ireland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
26/10/2010

'Sick Days' Cost Small Firms €563m

A new report by the Small Firms Association has shown that small businesses in Ireland lose over €563 million per annum through absenteeism.

The report also shows that workers in small companies are less likely to miss work through illness than their counterparts in larger businesses.

The study conducted by the Small Firms Association took place throughout Ireland and covered all sectors of Irish Business.

According to Avine McNally, Acting Director of the Small Firms Association the results show marked differences across sectors and regions, and show that small firms with less than 50 employees, are less likely to have workers absent on sick leave than larger firms.

“The national average for absenteeism is 3.6% or 8 working days. For large firms this rises to 4.6% or 10 working days. For small firms the average falls to 2.6% or 5 working days.

In cash terms, absenteeism costs small businesses with sick pay schemes an estimated €563 million per annum, based on average earnings of €143 per day.

“This takes no account of other direct costs such as the requirement to replace absent staff with other workers or overtime payments, and the cost of medical referrals; or of the indirect costs such as the effect on productivity and quality, the increased work pressure on other colleagues, and the admin time in managing absence. The overall cost in reality could be in closer to €900m,” commented McNally.

-- Advertisement --

“Back pain/injury and stress are the most commonly cited problems on medical certs.

“Employers should ensure that they are fulfilling their duty of care to their employees by including manual handling and stress when conducting risk assessments as part of their review of their Health & Safety Statements.”

McNally added: “it is a concern that stress remains one of the high reasons for absenteeism, as aside from the employees’ absence, stress can lead to a less productive workforce, faulty decision-making, and ultimately the possibility of legal action being taken against the company for negligence or constructive dismissal.

“With a contracting labour market some employees are being placed under additional pressure due to new and different responsibilities. Employers should be aware of the impact of their actions and consider the implementation of a specific policy on workplace stress. They should educate employees on stress management, while being receptive to the potential causes of stress and the early warning signs of stress. On a practical level, they should also ensure that their Employers Liability Insurance will protect them against any compensation awards that may arise from this area.”

In term of regions, the West and North-west and the North-east fair badly, with the average of 9.1 days (4.2%) and 7.2 days (3.3%) respectively.

McNally concluded: “There is an increasing need for business to have an overall policy to deal with absenteeism. There are issues for both employers and employees. Employers should be aware that there are a wide range of factors that can influence employees’ attendance patterns and levels.

“These include good communication, training and development, working conditions, job design, team working and the creation and fostering of a culture and organisational morale, which encourages and recognises excellent attendance. Promoting employee health and welfare, tackling the issues surrounding stress in the workplace and management training for handling absenteeism, should assist in reducing absenteeism.”

(GK)

Latest Construction News

25/11/2024

Northern Ireland-based construction company GRAHAM has been awarded Platinum accreditation by The 5% Club, which is their highest level of accolade. The 5% Club company, a benchmark of investment in future talent, awarded GRAHAM the Platinum membership for their unwavering commitment to empowering ...
25/11/2024

Building and civil engineering contractor Farrans, based in Dunmurry, Northern Ireland, has been selected as one of 19 businesses as preferred partners to SP Energy Networks' record £5.4bn supply chain contract programme. SP Energy Networks have selected the 19 companies to help them deliver the ...
25/11/2024

Energy provider ESB Networks has been working over the weekend to restore power to 60,000 homes predominantly in counties Donegal, Sligo, Mayo and Galway following the impact of Storm Bert. As of 5.10pm, 11,000 of ESB Network's customers remained without power, meaning 49,000 homes had saw their ...
25/11/2024

Alliance has rejected Infrastructure Minister John O'Dowd's claims that NI Water's funding model is 'fit for purpose'. Alliance Infrastructure spokesperson, Andy McMurray, accused the Minister of "burying his head in the sand" over the funding issues and stated that the Minister rejected evidence ...
25/11/2024

Grass Pitch Refurbishment Projects in Sandyford, Dublin, have successfully been completed, Dún Laoghaire-Rathdown County Council (DLR) has announced. Pitches at both Moreen Park and Páirc Uí Bhriain were the subject of upgrade and improvement works as part of an ongoing programme aimed at ...
25/11/2024

Northern Ireland construction company McLaughlin & Harvey placed runner-up for social impact at the Considerate Constructors Scheme (CCS) End of Year Gala. The event, recently held at the Natural History Museum in London, recognises and celebrates outstanding company-wide performance among ...
25/11/2024

Expert water services crews are working to locate and repair a major pipe burst which is impacting water supply across Mid Kerry, Uisce Éireann has announced. The affected raw water pipe provides water to the Mid Kerry Gearha Water Treatment Plant supplying Listry, Beaufort, Killorglin and ...
25/11/2024

Uisce Éireann has temporarily shut down the Dunmanway Water Treatment Plant in Cork after it was impacted due to poor raw water quality from storm flooding. The turbidity of the incoming water for treatment remains high, resulting in the closure of the plant, and reservoirs in the area are now ...
25/11/2024

Irish Government has offered financial support to householders who have been impacted by Storm Bert. The Humanitarian Assistance Scheme provides income-tested financial support to those whose homes have been damaged from flooding and severe weather events and who cannot meet costs for essential ...
25/11/2024

A topographic and hydrographic survey will be carried out from today onwards by Murphy Geospatial Limited for the N17 Knock to Collooney [Atlantic Economic Corridor] Project. The project will consider the upgrade of the existing N17 from Knock in County Mayo to Collooney in County Sligo. The ...
Kwik Floor ScreedRTS Heating & CoolingMaccaferri LtdAtlas Winch & Hoist Services (Southern) LimitedAPA Facade Systems (UK) LtdBDRs LimitedHi-Tec ConstructionPEFC [Ireland] LtdPro Roofers GalwayBrady Insurance Services Ltd
Terms and Conditions
2024/11/26 13:29:48